October 1st, 2018
Beginning on or about Monday, October 1 to Friday, October 5, 2018 from 7:00 a.m. to 6:00 p.m. GrandLinq will be testing the Light Rail Vehicle (LRV) between the Conestoga terminus and the Fairview terminus.
This work will require the self-powered LRV to travel at design speed (up to 50 km per hour). Minor delays at pedestrian crossings and vehicle crossings while the self-powered LRV is operated through the crossings are anticipated. Paid duty officers, signal support at intersections and flaggers (if needed) will be in place at road crossings to direct traffic as required and pedestrian crossings will be barricaded or have flaggers as required.